2020-02-20

Finising up the floor

There's not much to say about the rest of this, it was pretty straightforward and went the same way as the first part of the room.  Just very time consuming.




I also decided it makes the most sense to put the 2nd floor subpanel in the master bedroom closet instead, and I'm going to be moving the main plumbing stack to the other side of that wall, so it doesn't interfere with the dining room below.  So that's why there is a section left out of the floor.