Now that the floor is finally done, it's time to go back to the ceiling. I had to move everything... Lots of open space now.
The drywall jack is very useful for bringing down the joists nicely.
Since the floor is level now, I decided to just measure to 8'1" on each side and put in a nail on each side to rest the joist on once I got it up.
I'm definitely glad I waited to do the ceiling until I had the floor to work from. This is how level the joist was after the first try, and this took much less time than in the master bedroom.
And this is what the first one done looks like.
Journey through remodeling my house. The original goal of this blog is to look back on the project 20 years from now, when pictures aren't enough to remember everything, and I thought this was easiest way to do it. But I'm regretting that since Blogger's interface is only getting worse. I only update this periodically even though I'm usually working on something and taking pictures. Comments are disabled because of spam...so if you want to reach out for whatever reason my email is wcvp@me.com.
Subscribe to:
Post Comments (Atom)
Rubber roofing
Finally time to actually start on the rubber roof. That plastic I put down held up surprisingly well for how long it was there. Had to put ...
-
Now on to the window. The city building inspector wants all of the windows to have headers, which means I have to reframe all of them, and ...
-
I only took down the chimney below the roof line before, so now I had to get it down below the floor. The first part that was above the cei...
-
Finally time to actually start on the rubber roof. That plastic I put down held up surprisingly well for how long it was there. Had to put ...