2019-11-16

More ceiling removal

Now I'm removing the next section of ceiling, stopping where the lath does.  In the rest of the house, it is just a layer of decomposing wool with the cellulose right on top of it, so I'm not able to save as much of the cellulose like I could in the master bedroom.  But I'm just bagging everything this time.


Time to rearrange everything so I can do more of the ceiling later


And at some point in all of that, a bat scared me and I stepped through the small hole in the floor where the plumbing for the bathtub was, so I made a nice mess downstairs

Nice way of fixing it after cleaning it up

No comments:

Post a Comment

Note: Only a member of this blog may post a comment.

Rubber roofing

Finally time to actually start on the rubber roof.  That plastic I put down held up surprisingly well for how long it was there. Had to put ...