Before dealing will all the stuff over the stairs, I built a temporary platform out of OSB so it would be easy and safer to work over there
Here it is after it was all removed
So based off of everything I've seen it seems for the 2nd floor, the only original part is from the front room, back to the wall between the master bedroom and bathroom, and only as wide as the front room. It also explains why there is that one load baring stud that didn't seem like it should be. More on all of this later, here's an inside roof with shingles still on it
Journey through remodeling my house. The original goal of this blog is to look back on the project 20 years from now, when pictures aren't enough to remember everything, and I thought this was easiest way to do it. But I'm regretting that since Blogger's interface is only getting worse. I only update this periodically even though I'm usually working on something and taking pictures. Comments are disabled because of spam...so if you want to reach out for whatever reason my email is wcvp@me.com.
Subscribe to:
Post Comments (Atom)
Rubber roofing
Finally time to actually start on the rubber roof. That plastic I put down held up surprisingly well for how long it was there. Had to put ...
-
Now on to the window. The city building inspector wants all of the windows to have headers, which means I have to reframe all of them, and ...
-
I only took down the chimney below the roof line before, so now I had to get it down below the floor. The first part that was above the cei...
-
Finally time to actually start on the rubber roof. That plastic I put down held up surprisingly well for how long it was there. Had to put ...





No comments:
Post a Comment