2022-05-21

Making the hallway cabinet

I despise dead space, need something to cover up the breaker/patch panel, access for the shower valve, and main water shut off valves for the upstairs.  So I'm making a floor to ceiling cabinet thing in there.

These pieces are really long and a pain to work with.


Making sure it fits.  I had to plane off the one side to get it to line up right.


Now I have to make the box part that goes behind it.  That line boring machine is pretty awesome.

Since I want to have access to the shower valve, the backs can't be solid, so they're panels that are removable.


Wonderful planning strikes again, I had to move the breaker panel back (twice actually), and change how the shower valve and head was mounted because the wood was taking up too much space.

No comments:

Post a Comment

Note: Only a member of this blog may post a comment.

Rubber roofing

Finally time to actually start on the rubber roof.  That plastic I put down held up surprisingly well for how long it was there. Had to put ...