Finally got my permits, I was looking into what I needed to do to get them and one of the inspectors called me back they told me that I would have to get them today or wait an undetermined amount of time since they're going to be closed for the Coronavirus starting tomorrow. So I ended up scrambling some building plans together, and got all the permits:
Unfortunately, they took the original plan, but at least they gave me a copy...
Journey through remodeling my house. The original goal of this blog is to look back on the project 20 years from now, when pictures aren't enough to remember everything, and I thought this was easiest way to do it. But I'm regretting that since Blogger's interface is only getting worse. I only update this periodically even though I'm usually working on something and taking pictures. Comments are disabled because of spam...so if you want to reach out for whatever reason my email is wcvp@me.com.
2020-03-18
Subscribe to:
Post Comments (Atom)
Rubber roofing
Finally time to actually start on the rubber roof. That plastic I put down held up surprisingly well for how long it was there. Had to put ...
-
Now on to the window. The city building inspector wants all of the windows to have headers, which means I have to reframe all of them, and ...
-
I only took down the chimney below the roof line before, so now I had to get it down below the floor. The first part that was above the cei...
-
Finally time to actually start on the rubber roof. That plastic I put down held up surprisingly well for how long it was there. Had to put ...