I didn't take many pictures, but we put in a temporary-ish door. Once the upstairs is done, I'll be moving up there and doing the downstairs, so I need a way to get in up there, plus it makes getting large materials inside much easier. This was just an all in one thing from Lowe's that cost about $200. Once I get around to doing the siding I'll replace the door and frame with something permanent.
We also broke the window on the stairs as we were moving a cart of trash down...
And made a mess of the front yard. I backed my truck right up to the front door so we didn't have to deal with moving the carts down the front stairs and up into the bed.
Journey through remodeling my house. The original goal of this blog is to look back on the project 20 years from now, when pictures aren't enough to remember everything, and I thought this was easiest way to do it. But I'm regretting that since Blogger's interface is only getting worse. I only update this periodically even though I'm usually working on something and taking pictures. Comments are disabled because of spam...so if you want to reach out for whatever reason my email is wcvp@me.com.
Subscribe to:
Post Comments (Atom)
Rubber roofing
Finally time to actually start on the rubber roof. That plastic I put down held up surprisingly well for how long it was there. Had to put ...
-
Now on to the window. The city building inspector wants all of the windows to have headers, which means I have to reframe all of them, and ...
-
I only took down the chimney below the roof line before, so now I had to get it down below the floor. The first part that was above the cei...
-
Finally time to actually start on the rubber roof. That plastic I put down held up surprisingly well for how long it was there. Had to put ...