Last bedroom was the one that I already have done once, so that made it much less enjoyable...
Journey through remodeling my house. The original goal of this blog is to look back on the project 20 years from now, when pictures aren't enough to remember everything, and I thought this was easiest way to do it. But I'm regretting that since Blogger's interface is only getting worse. I only update this periodically even though I'm usually working on something and taking pictures. Comments are disabled because of spam...so if you want to reach out for whatever reason my email is wcvp@me.com.
2021-05-30
2021-05-29
Bathroom and Hall Ceiling Drywall
I'm using MMR drywall for the bathroom and walls surrounding it, so it's blue.
This is how I'm containing the low voltage wiring that has to go through the ceiling since it might actually need to be replaced at some point to support modern interfaces.
Lowe's didn't have any conduit elbows so I just ended up using a normal PVC one...
These triangle pieces are a real pain.
Lots of holes for boxes in the hallway.
Most of it is done now which is nice.
2021-05-21
Smoke detectors
Because of the extent of the remodel, I have to follow modern building code with a hard-wired smoke detector in each bedroom and one in the hallway. I decided to color the wiring red with a Magnum Sharpie so it would be easily identifiable in the future.
I should have worn gloves...
2021-05-08
Front room ceiling drywall
This room was definitely easier than the first, which was nice.
Trimming the foam still makes a mess...2021-05-01
Side room ceiling drywall
I decided to start with the hardest part of the ceiling drywall. I had to trim the sprayfoam first, I found that my oscillating multitool worked best, but man was it dusty. By far the worst dust I've dealt with so far since it is so light it stays in the air and is very irritating to eyes.
It also made a huge mess on the floorIt took a while to get the pieces to fit correctly, and man is it going to be a pain when I get to mudding to make it look good.
The rest of the ceiling went up easier though.
I'm leaving a section of drywall out of the ceiling in each room so it's easier to blow insulation in after.
Rubber roofing
Finally time to actually start on the rubber roof. That plastic I put down held up surprisingly well for how long it was there. Had to put ...
-
Now on to the window. The city building inspector wants all of the windows to have headers, which means I have to reframe all of them, and ...
-
I only took down the chimney below the roof line before, so now I had to get it down below the floor. The first part that was above the cei...
-
Finally time to actually start on the rubber roof. That plastic I put down held up surprisingly well for how long it was there. Had to put ...